-
Install the membrane with overlap and welded seam as per specifications.*
-
Mechanically secure the membrane to the deck according to the wind uplift pattern using fixing bars and approved fasteners.
-
Cover the fixing bars with a Sintofoil ST/1.2 mm strip (min. 150 mm) welded on both sides to membrane.
-
The membrane will be mechanically secured at roof perimeter and around protrusions.
-
The RG type membrane is recommended, would aesthetics (wrinkles) be an issue.