-
Store in dry, cool place. Apply outside or in properly ventilated area.
-
Use when temperature is 5°C and above.
-
The substrate will be clean, dry (check moisture by running a finger on substrate) and free from contamination.
-
Cover adhesive within 20 minutes max.
-
Apply adhesive in ridges, or by spray, 4 ea/m in field zone, 6 ea/m at perimeter, on substrate. Leave 5-10 minutes open time to accelerate green strength. Roll the FB membrane into adhesive before skin formation and press down. Roll and press again after 30 minutes approx.
-
When applying on dry substrate, moistening the membrane’s backing with water will improve the green strength.
-
Depending on temperature/humidity, the adhesive will set within 1 to 5 hours.When working in temperature under 5°C, heat up the pail in hot water (50°C).
-
Refer to Rubberfuse specifications and details.