-
Store in dry and cool place. Apply outside or in properly ventilated area.
-
Use when temperature is 5°C and above.
-
The substrate will be clean, dry (check moisture by running a finger on substrate) and free from contamination.
-
Cover adhesive within 20 minutes max.
-
Apply adhesive in ridges, 4 ea/m in field zone, 6 ea/m at perimeter on substrate.
Leave 5 minutes max. open time to accelerate green strength.
Lay the insulation board into adhesive before skin formation and press down.
Press again after 30 minutes approx.
-
Depending on temperature/humidity, the adhesive will set within 1 to 5 hours.
When working in temperature under 5°C, heat up the pail in hot water (50°C).
-
Refer to Rubberfuse specifications and details.